Product

Epoxy Flat Surface Coating

Drying time (top drying), h:≤8

Drying time (drying), h:≤48

The coating film has no cracks, no peeling falling

No bubbles, no peeling,  Allow slight discoloration

MORE +

Epoxy spread medium coating

After stirring and mixing Even, no hardness Block

Drying time (top dry):1h

Drying time (Practical work):16h

The paint film is complete, Not appearing Bubble

MORE +

Epoxy sealed primer

After stirring and mixing Even, no hard lumps

Drying time (surface drying):2h

Drying time (actual drying):16h

#Tensile bond strength:3.7Mpa

MORE +
< 12 >
Search HistoryClear all records
A maximum of 8 historical search records are displayed~
全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册